
This kitchen was completed in March 2015 for Mr & Mrs Bailey from Wepre. The original kitchen and ceilings were removed to allow for new electrics to be installed for appliances and lighting. A new UPVC window and patio door were installed before the whole room was then re plastered and allowed to dry. The new kitchen was the graphite “Holburn” handle less range from Benchmarx which was then installed together with Zanussi appliances and Compac “Absolute Blanc” quartz worktops and upstands. LED Spot lights were installed in the ceiling with under unit lighting from below the wall units. A touch of colour was added with the pink glass splashback and the feature made to measure wallpaper in the dining area. The floor was self leveled before Karndene tiles and trims were fitted. The radiator was replaced, new skirting boards and architraves fitted and the whole room was decorated. The whole job took two and a half weeks and was completed on schedule.
Below are some photographs showing various stages of the kitchen project. Hover over the photographs for each description.














