This kitchen was completed in September 2015 for Mr & Mrs Segar from Mold. The original kitchen and wall tiles were removed. The floor tiles were quite recent and so were covered over with protective material before the work commenced.  New electrics were installed for appliances and lighting and the plumbing  was adjusted for the sink and appliances.  The walls were then re plastered and allowed to dry. The new kitchen “Sherwood Bone White” from Benchmarx  was then installed together with AEG integrated appliances. Black “mirror chip” quartz worktops, upstands, splashback and window sills were then fitted. LED under cupboard lights were installed and the existing ceiling spot lights had the bulbs changed to new energy saving LED bulbs . The whole job took two weeks to complete

 

Below are some photographs showing various stages of the kitchen project. Hover over the photographs for each description.